Korean BBQ gas grill table: planning the gas supply

A Korean BBQ gas grill table needs a planned gas supply before the tables are built. That plan covers the right fuel for the grill model, piping sized and run by a licensed installer, a shutoff valve for each grill, a listed connector, a permit and a pressure test before the gas is turned on. Model codes such as the International Fuel Gas Code set many of these details, and your local building department decides which code applies. Settle them with the installer while the table layout is still a drawing, because each grill becomes its own gas appliance.
Start with the grill model and fuel type
Every table grill is a separate appliance with its own fuel rating, connection and instructions. Confirm the fuel first, because natural gas and propane equipment are set up differently.
HiLEE examples:
- Korean BBQ Square Gas Roaster (BM-340G): the product page says the roaster is configured for natural gas (NG) operation. For propane, the page asks buyers to contact HiLEE about conversion kit availability and compatibility. The product record lists a safety gas shut-off system.
- Commercial Gas Grill for Restaurants (BM-320G): the product page describes a built-in unit that needs a compatible table cutout, connects to the restaurant's natural gas supply line and must be installed by a licensed gas technician in accordance with local fire codes. The record lists spark ignition powered by a single AA battery.
If your building has no natural gas service, raise propane at the start of the quote. Do not assume a natural gas grill can be switched in the field. Get the conversion parts and instructions for that exact model in writing.
Check the appliance listing
CSA/ANSI Z83.11/CSA 1.8 is the standard for gas food service equipment. The ANSI Webstore listing for the 2025 edition says the standard covers tableside cooking appliances among other food service equipment. It also covers appliances for natural gas, propane and natural gas units convertible to propane or LP gases.
That scope tells you which standard to ask about. It does not tell you whether a given grill carries the listing. Ask the supplier for the certificate or directory entry that names the model number and fuel. The ETL and UL certification guide explains how to read those documents.
What the fuel gas code asks for at each grill
The rules below are from Chapter 4 of the 2021 International Fuel Gas Code on the ICC site. NFPA publishes a separate code, NFPA 54, the National Fuel Gas Code. Ask which code and edition your jurisdiction enforces, and whether it has local amendments.
Shutoff valves
Section 409.5.1 requires a shutoff valve for each appliance, in the same room and within 6 feet of it. The valve goes upstream of the union, connector or quick-disconnect it serves, and it must have access. For a dining room, that means planning one accessible valve per table grill.
Gas connectors
Section 411.1 lists the ways to connect an appliance to the piping, including rigid metallic pipe and listed appliance connectors that comply with ANSI Z21.24. Section 411.1.3 limits a connector to 6 feet and one connector per appliance, and the connector must carry the full demand of the appliance.
Commercial cooking appliances on casters, or moved for cleaning, need a connector listed to ANSI Z21.69/CSA 6.16 under Section 411.1.1. Movement of appliances on casters must be limited by a restraining device. A UL Solutions article for code officials makes the same point for movable gas cooking appliances.
Connectors inside the table
Section 411.1.3.3 says connectors may not be concealed within, or run through, walls, floors, partitions, ceilings or appliance housings. Its exceptions allow some piping materials and protected listed connectors through openings in an appliance housing or cabinet. A built-in table hides the connection inside the base, so ask the installer to show how the connector and valve layout meets this section.

Gas piping, permits and testing
Gas piping work needs a permit in many places. In Colorado, for example, the state plumbing rules say a permit and inspections shall be required for all fuel gas piping work. Who may pull the permit depends on your state and city license rules. Hire a licensed installer who works under your local code, and let that installer size the piping for every grill plus the kitchen load.
Section 406.1 of the fuel gas code requires piping to be visually inspected and pressure tested before acceptance and first use. Section 406.6.4 says appliances may not run until the piping is leak checked and purged and the appliance connections are leak checked. Cities add their own steps. The City of Austin rule requires a gas pressure test after gas plumbing work and a rough inspection before piping is covered or concealed. For a dining room, that can mean an inspection before floors or table bases close over the piping.
Plan the table base and gas route together
The gas route, the table base and the exhaust all meet at each table. Decide them at the same time:
- Where the main line runs: under the floor, in the ceiling or along a wall.
- Where each shutoff valve sits so staff can reach it.
- How the connector enters the table base and how it is protected.
- How the grill, cutout and base fit together.
The SC-9800 Korean BBQ Grill Table Base is one example. Its listing says it does not include the tabletop or the gas grill, needs a custom tabletop with grill cutouts and is compatible with the DB-2017G and SG-8288A grills. Confirm fit for any other grill model before ordering. Whether to build the grill into the table or use portable units is a separate choice, covered in the built-in vs. portable table setup guide.
Questions to ask your gas installer
- Which fuel gas code and edition does the city enforce at this address?
- Is the piping sized for every table grill plus the kitchen line at full use?
- Where will each grill's shutoff valve go, and can staff reach it during service?
- Which connector type and listing will you use at each grill?
- How will the connector pass into the table base?
- Who pulls the permit, and when are the rough and final inspections?
- Which pressure test and leak check will you perform before the grills are lit?
Next step
Compare Korean BBQ tables and gas grill options, then request a quote with your table count, floor plan and the fuel available at the site. Your licensed gas installer and local building department confirm the final piping, permit and test requirements.



